On this page
- How can I tell my gutters are finished?
- How does valley sun wear a gutter out?
- What does a replacement involve?
- Which upgrades are worth making at the same time?
- What does replacement cost?
- Does a replacement need a licensed contractor?
- How long will it take?
- What else is worth doing while the gutter is down?
- In what order should the work happen?
- Which local houses most often need replacement?
- Can I replace one wall at a time?
- Does it help when selling?
- Is a permit needed?
- What should I ask before signing?
- Parts replaced in a full job
- What happens to the old gutters?
- Can replacement be split across two seasons?
How can I tell my gutters are finished?
Look for faults that repeat on every wall rather than in one place.
- Paint chalked or faded through to bare metal
- Corners dripping again within a season of resealing
- Runs that will not stay straight after re-hanging
- Old sectional gutter weeping at most connectors
- Dents and kinks along the length
- Spills in ordinary winter rain even when clean
- Vinyl that has warped or split
One or two of those on one wall is a repair job. Several on every wall means replacement.
How does valley sun wear a gutter out?
| Part | What the sun does | What you notice |
|---|---|---|
| Paint | Fades and chalks | A powder on your fingertip |
| Sealant | Hardens and shrinks | Corner drips in the first storm |
| Spikes | Loosen as the metal moves daily | The gutter tipping forward |
| Fascia paint | Cracks and lifts | Bare wood behind the gutter |
| Vinyl | Softens and warps | A wavy line and split joints |
What does a replacement involve?
- Removal. Old gutters, downspouts and spikes come off and are hauled away. Aluminum is usually recycled.
- Inspection. With the fascia bare, every foot is checked. Rotten lengths are cut out, replaced and primed.
- Roof edge. On shingle roofs, a gutter apron goes in where drip edge is missing. On tile, the new gutter line is set to the tile lip.
- Layout. Outlets go where water can be led off the slab. Runs below valleys are upsized. Extra downspouts are added on long walls.
- New gutter. Formed and hung as in a new installation.
- Discharge. Extensions, splash blocks, drain lines or rain barrels finish each downspout.
- Test. Water through every run.
Which upgrades are worth making at the same time?
| Upgrade | Pays off when |
|---|---|
| 3x4 downspouts | Street trees overhang and the old downspouts kept clogging |
| 6-inch gutter | A two-storey roof spilled below its valleys |
| Extra outlets | Any run longer than about 40 feet |
| Hidden hangers | Always. They replace spikes |
| Gutter apron | Water ran behind the old gutter on shingles |
| Guards | Trees reach the roof |
| Buried lines or rain barrels | Water stood by the slab after storms |
What does replacement cost?
New gutter plus removal and any wood repair. Angi and This Old House both publish national ranges: about $9 to $14 per fitted foot for 5-inch seamless aluminum and $11 to $17 for 6-inch. No source publishes Modesto-only figures, so read those as a yardstick. See the Modesto cost guide.
| Item | Usually charged |
|---|---|
| Gutter and downspouts | Per foot |
| Removal and disposal | Included, or a flat fee |
| Fascia | Per foot, as found |
| Gutter apron | Per foot |
| Added downspouts | Each |
| Drain lines | Per foot |
| Guards | Per foot |
Does a replacement need a licensed contractor?
Almost certainly. A whole-house job in California will normally reach $1,000 or more, and the state requires a contractor's license above that line. The work sits under the C-43 Sheet Metal classification. Look up the license number before signing.
How long will it take?
| Stage | Typical time on a single-storey house |
|---|---|
| Removal | An hour or two |
| Wood inspection and repair | None to half a day |
| Forming and hanging | Three to five hours |
| Downspouts and discharge | An hour or two |
| Water test and tidy-up | Under an hour |
Two storeys, tile roofs and heavy wood repair stretch those times.
What else is worth doing while the gutter is down?
| Job | Worth it if |
|---|---|
| Paint or wrap the fascia | The paint is failing |
| Fit a gutter apron | Water used to run behind on shingles |
| Renew soffit panels | They are stained or soft |
| Fill old spike holes | Always |
| Close gaps birds use to get into the eave | There are nests or droppings |
| Have limbs trimmed back | They touch the roof |
In what order should the work happen?
- A new roof first, if one is due
- Fascia and soffit repairs
- Paint the fascia while it is bare
- New gutters and downspouts
- Drain lines and extensions
- Guards, where trees reach
Have the house painted before the new gutters go up, or paint the fascia while it is bare. Painters working round new gutters can scratch them.
Which local houses most often need replacement?
Ranches from the 1970s and 1980s still on original or second-set spiked gutters, tract homes from the 1990s where builder gutters have chalked through and leak at every corner, and older houses near downtown with sectional gutter fitted decades ago.
Can I replace one wall at a time?
Yes. K-style profiles match. The color may differ slightly where old paint has faded.
Does it help when selling?
Inspectors write up gutters pulling away, missing extensions and water marks at the slab. A system that is visibly worn out is worth replacing so it does not become a negotiating point. If it is merely tired, repairs and extensions cover most comments.
Is a permit needed?
Rarely for gutter replacement on a house. Ask the City of Modesto, your own city or Stanislaus County if you are changing drainage or working on a listed historic building.
What should I ask before signing?
- Could any runs be repaired instead, and why not?
- What changes in the layout?
- What is the per-foot rate for fascia?
- Which metal and thickness?
- Is removal included?
- How will a tile roof be protected?
- What is your license number?
Parts replaced in a full job
| Term | Plain meaning |
|---|---|
| K-style | The common gutter shape: flat back, curved front. Also called ogee |
| Fascia | The trim board nailed across the rafter ends. On most Modesto houses the gutter screws into it |
| Drip edge | Bent metal flashing laid under the first course of roofing. It throws water forward into the gutter |
| Gutter apron | A wider flashing shaped like an L. It slides under the roofing and drops into the gutter, sealing the gap behind it |
| Hidden hanger | A bracket clipped inside the gutter, held by a long screw through the gutter back into the fascia |
| Spike and ferrule | A long nail through the front of the gutter with a sleeve around it. The usual fixing on older gutters, and the one that loosens |
| Outlet | The tube set into the gutter floor that feeds the downspout. Also called a drop |
| Downspout | The pipe that carries water from gutter to ground. Also called a leader, the word California license rules use |
| Elbow | A bent length of downspout. A-style bends in and out from the wall, B-style bends sideways |
| Extension | A length added at the foot of a downspout to carry water farther out |
What happens to the old gutters?
They are taken away. Aluminum and copper have scrap value and are usually recycled. Steel is worth less. Vinyl usually goes to landfill.
Can replacement be split across two seasons?
Yes. Many owners replace the worst walls before the rains and the rest the following summer. Ask for both phases on one quote so the profile and color match.
